Skip to main content
Loading…
This section is included in your selections.

The charge for a temporary and/or construction service shall be the cost of installation, removal and materials. Credit will be given for a meter and the meter box only when there is no damage to the meter and meter box. The meter and meter box must be in fully usable condition, comparable to a new or rebuilt meter. The amount of the estimated cost of the temporary and/or construction service must be deposited to the city in advance. (Ord. 1237-86 § 15, 1986.)