Skip to main content
Loading…
This section is included in your selections.

A. Whenever deemed necessary, the director may require users to restrict their discharge during peak flow periods, designate that certain wastewater be discharged only into specific sewers, relocate and/or consolidate points of discharge, separate sewage wastestreams from industrial wastestreams, and such other conditions as may be necessary to protect the POTW and determine the user’s compliance with the requirements of this chapter.

B. When determined necessary by the director, each user discharging into the POTW shall install and maintain, on the user’s property and at the user’s expense, a suitable storage and flow-control facility to ensure equalization of flow. The director may require the facility to be equipped with alarms and a rate of discharge controller, the regulation of which shall be determined by the director. A wastewater discharge authorization (DA) may be issued solely for flow equalization. (Ord. 3071-08 § 2.8, 2008.)