A. Metered. In the case of water consumed during construction of a building or structure which, upon completion, would be served through a metered connection, the amount of water so consumed during construction shall be paid for by the contractor or owner at the applicable metered rate. If a metered service is not installed to the premises during the initial stage of construction, the amount of water consumed between the commencement of construction and the installation and turn-on of the metered service shall be estimated by the utilities superintendent and the charge added to the cost for installation of the service connection, or added to a subsequent water billing to the premises.

B. Fixed Rate. In the case of water consumed during construction of a residence which, upon completion, would be eligible for a fixed rate service, there shall be no charge other than the fixed rate charge, provided the service connection is installed and turned on during the initial stage of construction. (Ord. 1237-86 § 59, 1986.)